# SMA 1001: L / N swapped

**Series:** SMA Sunny Tripower 3.0 / 4.0 / 5.0 / 6.0 (STPxx-3AV-40)

**Meaning:** The L and N connections have been installed the wrong way round. SMA asks the installer to check the AC wiring between the inverter and the feed-in meter and to measure the AC voltages at the inverter connection, and to contact Service if the message persists.

## Likely causes
- Line and neutral conductors swapped at the AC terminal
- AC wiring fault between inverter and feed-in meter

## Checks
- Check the AC wiring from the inverter to the feed-in meter
- Check the AC voltages on the inverter connection
- If the message is still displayed, contact SMA Service

## Parts implicated
AC wiring

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: grid_tie

## Provenance
- [manual] p. 87 — "Explanation: Incorrect installation of the L / N connection." — https://files.sma.de/downloads/STP3-6-3AV-40-BE-en-22.pdf (retrieved 2026-11-21)

- Confidence: verified
- Verified by: manual
- Requires qualified installer: yes