# SMA 1302: Waiting for grid voltage - grid connection installation error

**Series:** SMA Sunny Tripower 3.0 / 4.0 / 5.0 / 6.0 (STPxx-3AV-40)

**Meaning:** The inverter cannot see a complete AC connection because L or N is not connected, so it waits for the grid voltage. SMA tells the installer to ensure the line conductors are connected, the miniature circuit breaker is on, and the AC cable is undamaged and correctly connected.

## Likely causes
- Line or neutral conductor not connected
- Miniature circuit breaker switched off
- Damaged AC cable or incorrect connection

## Checks
- Ensure that the line conductors are connected
- Ensure that the miniature circuit breaker is switched on
- Ensure that the AC cable is not damaged and is connected correctly

## Parts implicated
AC wiring, AC circuit breaker

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: grid_tie

## Provenance
- [manual] p. 88 — "Explanation: L or N not connected." — https://files.sma.de/downloads/STP3-6-3AV-40-BE-en-22.pdf (retrieved 2026-11-21)

- Confidence: verified
- Verified by: manual
- Requires qualified installer: yes