# SMA 3902: Waiting for DC start conditions - start conditions not met

**Series:** SMA Sunny Tripower 3.0 / 4.0 / 5.0 / 6.0 (STPxx-3AV-40)

**Meaning:** Events 3901 and 3902 are a wait state, not a fault: the feed-in conditions for the utility grid are not yet fulfilled, so the inverter has not started. SMA's measures are to clear snow or shade from the array, wait for higher irradiation and, if it happens every morning, raise the parameter 'Critical voltage to start feed-in'.

## Likely causes
- Low irradiation in the morning or poor weather
- Snow cover or shading on the PV array
- Start voltage parameter set too high for the array

## Checks
- Ensure that the PV array is not covered by snow or otherwise shaded
- Wait for higher irradiation
- If the message appears frequently in the morning, increase the parameter Critical voltage to start feed-in

## Parts implicated
PV modules

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: pv_dc

## Provenance
- [manual] p. 91 — "Explanation: The feed-in conditions for the utility grid are not yet fulfilled." — https://files.sma.de/downloads/STP3-6-3AV-40-BE-en-22.pdf (retrieved 2026-11-21)

- Confidence: verified
- Verified by: manual
- Requires qualified installer: no