# SolarEdge 18x37: V-Line max (line-to-line over-voltage)

**Series:** SolarEdge single-phase and three-phase inverters (Europe & APAC)

**Meaning:** The line-to-line AC voltage exceeded the country limit. The addendum says to verify the country setting, switch the site's inverters off and verify the AC grid voltage, use a larger gauge AC wire on long runs, consult the grid operator and, where permitted, change the grid protection values.

## Likely causes
- Grid over-voltage above the country limit
- Wrong country/grid-code setting
- Voltage rise on a long or undersized AC run

## Checks
- Verify the inverter is set to the correct country
- Turn off the site's inverters and measure the AC grid voltage
- Use a larger gauge AC wire if the run to the grid connection point is long
- Consult the grid operator and change grid protection values only where permitted

## Parts implicated
AC wiring

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: grid_tie

## Provenance
- [manual] p. 5 — "V-Line Max AC voltage too high Verify that the inverter is set to the correct country." — https://web.archive.org/web/20230202122919/https://knowledge-center.solaredge.com/sites/kc/files/se-inverter-installation-guide-error-codes.pdf (retrieved 2026-11-21)

- Confidence: verified
- Verified by: manual
- Requires qualified installer: yes