# SolarEdge 2x28: Islanding

**Series:** SolarEdge single-phase and three-phase inverters (Europe & APAC)

**Meaning:** The inverter detected that the AC grid is down and stopped producing (islanding). It restarts automatically after the reconnection time once AC grid voltage returns; if the problem persists, consult the grid operator.

## Likely causes
- Grid outage or upstream breaker open
- Grid voltage outside the window for the reconnection time

## Checks
- Confirm the grid supply is present at the main connection point
- Wait for the reconnection time after the grid returns
- Consult the grid operator if the inverter does not reconnect

## Parts implicated
none

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: dc_arc, grid_tie

## Provenance
- [manual] p. 4 — "Islanding Grid is down. When AC grid voltage returns the inverter will restart after the reconnection time." — https://web.archive.org/web/20230202122919/https://knowledge-center.solaredge.com/sites/kc/files/se-inverter-installation-guide-error-codes.pdf (retrieved 2026-11-21)

- Confidence: verified
- Verified by: manual