# SolarEdge 3x6E: Energy meter communication error

**Series:** SolarEdge single-phase and three-phase inverters (Europe & APAC)

**Meaning:** The inverter lost communication with the SolarEdge energy meter. The addendum refers you to the energy-meter-with-Modbus troubleshooting guide.

## Likely causes
- RS485 wiring fault or wrong meter address
- Meter not powered or terminated incorrectly

## Checks
- Follow the SolarEdge energy meter with Modbus troubleshooting guide
- Check the RS485 A/B wiring, termination and meter address
- Confirm the meter is powered

## Parts implicated
energy meter, RS485 cabling

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: dc_bus, pv_dc

## Provenance
- [manual] p. 5 — "Energy Meter Comm. Error Refer to the Energy Meter troubleshooting at:" — https://web.archive.org/web/20230202122919/https://knowledge-center.solaredge.com/sites/kc/files/se-inverter-installation-guide-error-codes.pdf (retrieved 2026-11-21)

- Confidence: verified
- Verified by: manual
- Requires qualified installer: yes
