# Victron Err 72: Phase rotation

**Series:** Victron SmartSolar / BlueSolar MPPT charge controllers, Inverter RS / Multi RS, Orion Smart DC-DC

**Meaning:** The phase order is not correct (L1->L2->L3) on a three-phase system; the inverters stay operational but will not connect to the grid.

## Likely causes
- Incorrect phase order in the installation

## Checks
- Check and correct the phase order to L1->L2->L3

## Parts implicated
AC wiring

## Safety
Qualified installer only. High-voltage, grid-tied and battery systems can kill. Do not open energised DC/AC equipment. This page is a diagnostic reference, not step-by-step work instructions. Isolate and verify de-energised before any physical check, and escalate to a qualified installer/electrician for anything beyond reading the display or checking a connector on isolated equipment.

Safety flags: grid_tie

## Provenance
- [vendor_kb] § Err 72 - Phase rotation — "Applies to Inverter RS and Multi RS models." — https://www.victronenergy.com/live/mppt-error-codes (retrieved 2026-11-21)

- Confidence: vendor
- Verified by: vendor_kb
- Requires qualified installer: yes
