SMA Sunny Tripower 3.0 / 4.0 / 5.0 / 6.0 (STPxx-3AV-40)

SMA 3902: Waiting for DC start conditions - start conditions not met

confidence: verifiedchecked 2026-11-21
Quick answerSMA 3902 means Events 3901 and 3902 are a wait state, not a fault: the feed-in conditions for the utility grid are not yet fulfilled, so the inverter has not started. SMA's measures are to clear snow or shade from the array, wait for higher irradiation and, if it happens every morning, raise the parameter 'Critical voltage to start feed-in'..
Escalation. If the fix goes beyond a non-invasive check or a software setting, or you are not sure the system is isolated, stop and call a qualified installer.

What it means

Events 3901 and 3902 are a wait state, not a fault: the feed-in conditions for the utility grid are not yet fulfilled, so the inverter has not started. SMA's measures are to clear snow or shade from the array, wait for higher irradiation and, if it happens every morning, raise the parameter 'Critical voltage to start feed-in'.

Likely causes

  • Low irradiation in the morning or poor weather
  • Snow cover or shading on the PV array
  • Start voltage parameter set too high for the array

What to check

  1. Ensure that the PV array is not covered by snow or otherwise shaded
  2. Wait for higher irradiation
  3. If the message appears frequently in the morning, increase the parameter Critical voltage to start feed-in

Parts implicated

PV modules
Sources (verbatim):