SolarEdge single-phase and three-phase inverters (Europe & APAC)
SolarEdge 18x37: V-Line max (line-to-line over-voltage)
Quick answerSolarEdge 18x37 means The line-to-line AC voltage exceeded the country limit. The addendum says to verify the country setting, switch the site's inverters off and verify the AC grid voltage, use a larger gauge AC wire on long runs, consult the grid operator and, where permitted, change the grid protection values..
Qualified installer only. This fault touches the AC grid connection, battery bank, DC bus, or an internal power stage. Isolate and verify de-energised, then escalate to a qualified installer/electrician.
What it means
The line-to-line AC voltage exceeded the country limit. The addendum says to verify the country setting, switch the site's inverters off and verify the AC grid voltage, use a larger gauge AC wire on long runs, consult the grid operator and, where permitted, change the grid protection values.
Likely causes
- Grid over-voltage above the country limit
- Wrong country/grid-code setting
- Voltage rise on a long or undersized AC run
What to check
- Verify the inverter is set to the correct country
- Turn off the site's inverters and measure the AC grid voltage
- Use a larger gauge AC wire if the run to the grid connection point is long
- Consult the grid operator and change grid protection values only where permitted
Parts implicated
AC wiring
Sources (verbatim):
- https://web.archive.org/web/20230202122919/https://knowledge-center.solaredge.com/sites/kc/files/se-inverter-installation-guide-error-codes.pdf (manual, retrieved 2026-11-21) p. 5
“V-Line Max AC voltage too high Verify that the inverter is set to the correct country.”
Paraphrased; verify against the manual for your exact model and serial number.